Concept site prepared for Insul-Con, Inc. by BlueCollar Cloud Solutions. Photos, logo, project names, and program details are placeholders awaiting Insul-Con's own material.

Every system that moves heat.

Mechanical systems insulation is the whole business. No roofing, no attics, no side trades. Just the pipe, duct, and equipment scope, done to the spec, on the schedule.

Piping systems

Hot water, chilled water, steam and condensate, refrigerant, domestic hot and cold, and process lines. Material selected by service temperature and the spec section, never by what is on the truck.

FiberglassASTM C547 · -20°F to 1000°F

The workhorse for HVAC and plumbing. ASJ-SSL jacket on interior work, with PVC fitting covers and vapor-sealed joints on all cold lines.

Cellular glassASTM C552 · Cold service & below-ambient

Closed-cell, non-absorbent system for chilled water, brine, and low-temperature process where vapor drive is the failure mode.

ElastomericASTM C534 · Refrigerant & condensate

Flexible closed-cell for refrigerant suction, condensate drains, and tight equipment rooms. Seams glued, not taped.

Calcium silicate & mineral woolASTM C533 / C547 · High-temp & steam

Steam, high-pressure condensate, boiler breeching, and exhaust. Finished in aluminum or stainless jacketing with banded seams.

Fittings, valves & flangesMatching finish on every component

Mitered or pre-formed fitting insulation, PVC or metal covers, and removable insulated valve and flange covers where the owner will need access.

Duct systems

Wrap for concealed runs, board for plenums and exposed duct, liner where the acoustic spec calls for it. Facing sealed with matching tape and mechanically pinned so it stays sealed after the ceiling closes.

Duct wrapFSK-faced fiberglass · 1.5" to 3"

Concealed supply and return. Stapled and taped seams, all joints sealed for vapor control on cooled air.

Duct boardASJ or FSK rigid board · Plenums & exposed

Square, pinned, and finished for exposed duct in gyms, lobbies, and manufacturing floors. Clean corners that architects sign off on.

Kitchen exhaust wrapListed grease-duct enclosure systems

Zero-clearance fire-rated wrap for commercial kitchen grease duct, installed to the listing with banding and collar details documented for the AHJ.

Outdoor ductWeatherproof jacketing & mastic

Rooftop duct finished in aluminum jacket or reinforced mastic with fabric membrane. Slopes, laps, and seams built to shed water for the life of the roof.

Equipment & specialty

The work that separates an insulation contractor from an insulation installer: irregular shapes, hot surfaces, and systems the owner will need to open again.

Tanks, vessels & exchangersCustom-fit block & blanket · Metal jacket

Field-measured insulation and fabricated aluminum or stainless jacketing on storage tanks, heat exchangers, deaerators, and receivers.

Boilers, chillers & pumpsRemovable systems where service matters

Chiller barrels, boiler breeching, pump bodies, and strainers. Removable blanket covers so the mechanic never has to cut off good insulation.

Personnel protectionOSHA surface-temperature limits

Insulation and guards on hot surfaces in reach of workers, so a plant walk-down passes the first time.

Firestopping at penetrationsInsulated pipe & duct through rated assemblies

Where the insulation scope crosses a rated wall or floor, we detail and install the listed firestop system for the insulated penetration.

Re-insulation & repairOccupied buildings · Plant outages

Replacing wet, crushed, or asbestos-abated insulation on existing systems, phased around occupancy or a shutdown window.

How we bid

Send the mechanical drawings, the insulation spec section (typically 23 07 00 and 22 07 00), and the bid date. Our estimators quantify by system and service, price the material actually specified, and return a scope letter that says what is in and what is out. No unit-price surprises after award.

How we deliver

Submittals with product data and thickness schedules before mobilization. A working foreman on every job. Daily cleanup, and jacketing finished behind the pipe fitters so the ceiling can close on schedule. Closeout with as-installed thickness schedule and warranty letter.

Have a spec section to price?

Estimates return from Buford, Macon, or Columbus depending on the job address.

Request a bid